Step one is to drill a
¼ hole 1 ½" deep in the top center of the bun
foot. It is important that the hole is drilled straight up and
down so that the metal part will be at a 90 degree angle to the
top surface of the bun foot.
After the hole is drilled
the use of a tool called a vise grip is helpful in grasping the
screw dowel.
The screw dowel simply
is screwed into the top of the bun foot as demonstrated. The procedure
is finished when half of the screw dowel\'s length is in the bun
foot.
Once this step is complete
drill a 3/8" hole in the bottom of your piece 1 ½"
deep then hand screw your entire bun foot into the bottom of the
piece.




Bookmark







